At the Cairo Metro Control Building, we carried out painting and raised floor installation. A key challenge was ensuring the raised flooring system could support heavy control equipment while allowing easy access to cabling and infrastructure underneath. To solve this, we used a raised floor system designed for technical environments, paired with anti-static finishes to protect sensitive equipment. Our painting team applied durable, low-VOC coatings suited for 24/7 operational spaces. The result was a clean, functional, and future-ready control environment.

Location

Egypt, Cairo

Client/Developer

Vinci/Orascom/Parson

Speciality

Paint, Raised Floor
At the Cairo Metro Control Building, we carried out painting and raised floor installation. A key challenge was ensuring the raised flooring system could support heavy control equipment while allowing easy access to cabling and infrastructure underneath. To solve this, we used a raised floor system designed for technical environments, paired with anti-static finishes to protect sensitive equipment. Our painting team applied durable, low-VOC coatings suited for 24/7 operational spaces. The result was a clean, functional, and future-ready control environment.

Location

Egypt, Cairo

Client/Developer

Vinci/Orascom/Parson

Speciality

Paint, Raised Floor